PHOTO: TZ TISNO
Bridge lifting timetable

Important information for drivers: 

The island of Murter is connected to the mainland (town of Tisno) by a movable bridge, which regulates the dynamics of sea and road traffic.

Bridge lifting timetable: 

15th June – 15th September – every day: 5 pm - 5.30 pm

16th September - 31st May - Monday and Friday: 9 – 9.20 am